2014
We re plumbed the swimming pool and put some new jets in it. The old plumbing was leaking.
We installed a new outdoor walk-in freezer behind the Dining Hall.
We are building a roof over the archery for the shooters and staff. Most of this is complete. All that is needed now is to put the tin on the structure.
2013
We have started another apartment in the RV area. Two buildings have been moved in to be used as the basic structure and a footing was poured on September 10th.
We are building an apartment in the back of the R.V. House. Years ago this was a shower house. (Update, this apartment is now completed)

August 2012 A steel roof has been installed on the directors house.

May 2012 Air-conditioners have been installed in all the camper cabins. New electric wire has been buried for the higher load of running the air-conditioners. 

May 2012 Internet has been installed around the camp with 7 WiFi access points.

November 2011 Around 80 Oak and Maple trees were planted around the camp.

October 2011 A new steel room was installed on the pole shed on the west edge of the camp.

Sept 2011 The new steel roof has been completed on the RV House

May 2011 Rebuilding the Men’s Workers Cabin. It now has a second restroom and central heat and air.

2008 Rebuilding the Women’s Workers Cabin. It now has a second restroom and central heat and air.